We Offer Same Day Despatch on all stock items, Monday -
Friday on orders placed before 16:00 GMT. Next day delivery is available to certain
shipping Destinations.
https://cleanroomshop-m2.preview.smartebusiness.co.uk/modular-hardwall-cleanroom-6x3.html5926Modular Hardwall Cleanroom - 6 x 3mhttps://cleanroomshop-m2.preview.smartebusiness.co.uk/media/catalog/product/c/r/cr6-800x1000_6.jpg1795017950GBPInStock/CLEANROOMS, LAMINAR FLOW & TRAINING/Home Featured/CLEANROOMS, LAMINAR FLOW & TRAINING/Modular Cleanrooms/CLEANROOMS, LAMINAR FLOW & TRAINING/Modular Cleanrooms/Hardwall Cleanrooms/Vape and E-Liquid10151182092141210118<ul>
<li>Designed to achieve ISO 14644-1 Class 7 in Production Area through positive pressure </li>
<li>18m² (6m x 3m x 2.1m high)</li>
<li>Integral change area to support gowning protocols</li>
<li>HEPA filtration (2 FFUs), 99.99% efficient @ 0.3 micron</li>
<li>Swing cleanroom door for entrance</li>
<li>Robust steel frame, with hygienic coating and clear hardwall panels to exterior walls</li>
<li>Self-assembly kit with optional installation and validation</li>
<li>Forklift required upon delivery for offloading pallets</li>
</ul>
<p><em>Installation and validation pricing is for mainland UK locations. Price on Application for all other areas or if a wider scope of works is required</em></p> <h4>Modular Hardwall Cleanroom - 6 x 3m</h4>
<ul>
<li>Optional flooring, trunking, installation and validation</li>
<li>Dado Trunking and sockets only available to UK customers due to variations and compatibility across the EU and rest of the world standards. Dado trunking without sockets is available upon request. Please contact us on 01524 813 022 to discuss your requirements.</li>
<li>Please make arrangements to offload the pallets when received</li>
<li>Please ensure you are ordering correctly against your specification as these are non-returnable items, unless found faulty on receipt of order</li>
</ul>
<h4>Validation Only </h4>
<ul>
<li>This cost is based on work being carried out Monday to Friday 9am to 5pm and the validation will be to ISO 14644-1:2015 standard.</li>
<li>The validation will include particle counts to the ‘as built’ occupancy state and airflow readings, it will be inclusive of an interim and full validation report.</li>
<li>Validation will be subject to our availability and current demand.</li>
<li>Pricing is based on the location being within mainland UK. Price on Application for other areas or if a wider scope of works is required.</li>
</ul>
<h4>Installation & Validation </h4>
<ul>
<li>This cost is based on 2 engineers attending site over 2 consecutive working days, Monday to Friday 9am to 5pm to carry out the installation of the cleanroom and then a validation to ISO 14644-1:2015.</li>
<li>The validation will include particle counts to the ‘as built’ occupancy state and airflow readings, it will be inclusive of an interim and full validation report.</li>
<li>Installation will be subject to our availability and current demand.</li>
<li>Pricing is based on the location being within mainland UK. Price on Application for other areas or if a wider scope of works is required.</li>
<li>Electrical works are excluded from Installation & Validation option. When completing your own installation, your electrician must be qualified to Electrical Inspection & Testing 2391.</li>
</ul>
<h4>Service Contract </h4>
<ul>
<li>This will provide you with a complete package to maintain and protect your critical processes and investment. This will include an extended warranty for a further 12 month period, 24/7 phone support, a call out support in between service visits and 2 engineer visits to be taken over a 12 month period from the date of installation. Visits will take place within working days, Monday to Friday 9am to 5pm. The interim visit (6 months after install) will include particle counts to ISO 14644-1:2015 standard in the ‘at rest’ occupancy state, air change rates, airflow readings on the annual full visit (12 months after install). Price is inclusive of an interim and full validation report.</li>
<li>Pricing is based on the location being within mainland UK. Price on Application for other areas or if a wider scope of works is required.</li>
</ul>
<h4>Bespoke Cleanrooms</h4>
<p>This cleanroom is part of our modular cleanroom range, with standard cleanrooms available in assembly kit form for a fast contamination control solution. If you need a cleanroom with a larger footprint, a lower ISO class, a different layout, or even in a different colour, contact <span style="color: #ff0000;"><a href="https://www.connect2cleanrooms.com/services/design-build" target="_blank" rel="noopener">Connect 2 Cleanrooms</a></span> to discuss your project.</p>
<p>Please call the team on 01524 812899 for support, bespoke enquiries or any further questions.</p>GBP00Connect 2 CleanroomsCleanroom3-5 daysPowder coated, mild steel frame2.425m (2.1m internal height)White RAL9003Designed as an entry level cleanroom, this cleanroom provides a quick solution for those organisations looking to create a classified production area.
Suitable for e-liquid production, electronics, laboratory, engineering, healthcare and energy applications.United Kingdom2No. HEPA Fan filter unitsNon-SterileISO Class 7+YesNo castorsHEPACR6 - 6x3m6 x 3m1 x 3m5 x 3m PETg clear hardwall panels to 4No. exterior wallsPVC Softwall divide between Production Area and Change AreaSteel swing door entranceLED lighting1No. Fan filter unit differential pressure gauge1No. Variable speed controller for HEPA fan filter unitsLow level vent protectorsOptional jigsaw flooring kit - GTI Max Sapphire BlueOptional dado trunking kit with up to 10 double sockets / RJ45 ethernet outletsOptional
You have requested more information for: Modular Hardwall Cleanroom - 6 x 3m
Optional flooring, trunking, installation and validation
Dado Trunking and sockets only available to UK customers due to variations and compatibility across the EU and rest of the world standards. Dado trunking without sockets is available upon request. Please contact us on 01524 813 022 to discuss your requirements.
Please make arrangements to offload the pallets when received
Please ensure you are ordering correctly against your specification as these are non-returnable items, unless found faulty on receipt of order
Validation Only
This cost is based on work being carried out Monday to Friday 9am to 5pm and the validation will be to ISO 14644-1:2015 standard.
The validation will include particle counts to the ‘as built’ occupancy state and airflow readings, it will be inclusive of an interim and full validation report.
Validation will be subject to our availability and current demand.
Pricing is based on the location being within mainland UK. Price on Application for other areas or if a wider scope of works is required.
Installation & Validation
This cost is based on 2 engineers attending site over 2 consecutive working days, Monday to Friday 9am to 5pm to carry out the installation of the cleanroom and then a validation to ISO 14644-1:2015.
The validation will include particle counts to the ‘as built’ occupancy state and airflow readings, it will be inclusive of an interim and full validation report.
Installation will be subject to our availability and current demand.
Pricing is based on the location being within mainland UK. Price on Application for other areas or if a wider scope of works is required.
Electrical works are excluded from Installation & Validation option. When completing your own installation, your electrician must be qualified to Electrical Inspection & Testing 2391.
Service Contract
This will provide you with a complete package to maintain and protect your critical processes and investment. This will include an extended warranty for a further 12 month period, 24/7 phone support, a call out support in between service visits and 2 engineer visits to be taken over a 12 month period from the date of installation. Visits will take place within working days, Monday to Friday 9am to 5pm. The interim visit (6 months after install) will include particle counts to ISO 14644-1:2015 standard in the ‘at rest’ occupancy state, air change rates, airflow readings on the annual full visit (12 months after install). Price is inclusive of an interim and full validation report.
Pricing is based on the location being within mainland UK. Price on Application for other areas or if a wider scope of works is required.
Bespoke Cleanrooms
This cleanroom is part of our modular cleanroom range, with standard cleanrooms available in assembly kit form for a fast contamination control solution. If you need a cleanroom with a larger footprint, a lower ISO class, a different layout, or even in a different colour, contact Connect 2 Cleanrooms to discuss your project.
Please call the team on 01524 812899 for support, bespoke enquiries or any further questions.
Designed as an entry level cleanroom, this cleanroom provides a quick solution for those organisations looking to create a classified production area.
Suitable for e-liquid production, electronics, laboratory, engineering, healthcare and energy applications.
Country of origin
United Kingdom
Technical data
2No. HEPA Fan filter units
Sterility
Non-Sterile
Cleanroom class
ISO Class 7+
CE Certified
Yes
Castors
No castors
Filtration
HEPA
Cleanroom
CR6 - 6x3m
Area
6 x 3m
Change area
1 x 3m
Production area
5 x 3m
Exterior walls
PETg clear hardwall panels to 4No. exterior walls
Internal walls
PVC Softwall divide between Production Area and Change Area
Doors
Steel swing door entrance
Lighting
LED lighting
Pressure gauge
1No. Fan filter unit differential pressure gauge
Controls
1No. Variable speed controller for HEPA fan filter units
Vents
Low level vent protectors
Flooring
Optional jigsaw flooring kit - GTI Max Sapphire Blue
Trunking
Optional dado trunking kit with up to 10 double sockets / RJ45 ethernet outlets
We offer same day despatch on all stock items, Monday to Friday, with no minimum or maximum quantity.
Please note that the cut off point for same day despatch for stock items is before 16:00. If you place your order after this time and need your goods urgently, please give us a call and we’ll see what we can do.
Typically orders received after 16:00 will be despatched the following working day, providing goods are in stock.
UK MAINLAND DELIVERIES
Weight (KG)
Next day before 17.30pm*
Next day before noon
Next day before 10.30am
1 - 20
£9.99
£13.50
£21.00
21+
+£0.36 per extra kg
+£0.44 per extra kg
+£0.48 per extra kg
*Please note that the 'Next day before 17.30pm' delivery can be made any time between 7.30am and 17.30pm.
OTHER UK ZONE DELIVERIES & international
We offer a range of delivery methods for countries outside of Mainland UK, for Northern Scotland, Northern Ireland, Isle of Man & Scilly Isles & Channel Islands. We also offer International Delivery for 50+ countries.